A practical starting point for property managers, owners corporations and facilities teams: define the fire-safety brief, understand the defects and plan the work required.

01 / Define the building brief
Start with the systems installed at your property and the records you already hold. Existing findings help identify the right assessment, trade or specialist input.
Specialist capability, direct or partner delivery, and the work Gen Z can accept are confirmed before engagement. The areas below describe requirements to discuss.
Smoke alarms, smoke and thermal detectors, fire indicator panels and associated alarm systems.
Bring the system type, service history and any fault or defect information.
Discuss this systemEmergency luminaires, exit signs and associated test and maintenance records.
Identify failed fittings, locations, previous test results and access requirements. Lighting tests can be booked with test and tag in the same visit.
Discuss this systemPortable equipment, its location, condition and recorded servicing requirements.
Share the equipment list and any items identified for servicing or replacement.
Discuss this systemHydrants, hoses, reels, sprinkler systems and associated pumps and cabinets.
System-specific inspection, testing and repairs need a confirmed specialist scope.
Discuss this systemFire and smoke doors, door hardware and access or egress issues identified in the building brief.
Bring door schedules and existing findings; general carpentry is not a substitute for the required fire-door scope.
Discuss this systemMechanical ventilation and other equipment, including sump pumps, where relevant to the property’s maintenance brief.
The building documents determine which systems belong in the ESM scope.
Discuss this systemEquipment in focus



02 / Essential Safety Measures
Victorian guidance explains that building owners have responsibilities for maintaining required Essential Safety Measures and preparing annual ESM reports. The applicable building documents and maintenance requirements need to be checked for the property.
Annual reporting, routine service records and individual defect reports have different purposes. Agree the reporting scope and who is responsible for preparation and sign-off.
Victorian ESM guidance
Bring to the first conversation
Missing documents can be identified in the initial brief; a document review alone does not certify a building.
03 / From findings to authorised work
An assessment should help you make the next decision. Clarify the findings, distinguish required repairs from optional improvements and agree an itemised scope before work proceeds.
Agree the property, systems and checks in scope. Inspect and record the findings.
Separate defects needing attention from recommendations and optional improvements.
Define the rectification work, pricing, access and approval required.
Carry out the authorised repairs and document the work performed.
Agree the next checks and keep available reports and job records together.
Define the affected items, proposed work, access, pricing, exclusions and any specialist dependencies.
Record what was completed, the checks included in the scope and any defects still requiring action.
04 / Keep the next check in view
Discuss a maintenance arrangement around your equipment, required checks, site access and approval process. Frequencies and technical requirements are confirmed against the actual systems and building documents.
Use the Gen Z client portal for available job updates and documents. Agree responsibility for due dates and follow-up.
Discuss a maintenance planA useful ongoing brief
The system type, technical scope and delivery arrangements must be confirmed first. Some requirements may need specialist input; this page does not promise direct delivery across every fire discipline.
Yes. Discuss the findings and supporting records with the team. Any further investigation, site attendance or rectification work will have its own agreed scope and pricing.
No. Completion relates to the authorised work and any specified testing. Other systems, unresolved defects and annual reporting requirements remain separate.
A 24/7 specialist callout service is not confirmed. Contact the team to establish availability for urgent equipment faults. For an active fire or immediate danger, call 000.